Studio Build Update

🎙️ Studio Build Update

We’re buzzing with excitement — the studio is almost there! It’s been a long journey, but it’s absolutely going to be worth the wait.


🙌 Gratitude Shout-Outs

So many people have stepped up to make this dream happen, massive thank you to:

  • 💪 Tom and his crew at Alco – for taking on the structural build. A huge, huge thank you!
  • 👏 Everyone who’s pitched in so far – your support has been incredible.

🏗️ Progress So Far

  • ✅ The studio shell is complete.
  • 🔌 Electrics are scheduled to be finished after October 18th.
  • 🎛️ Acoustic tiles ready to be stuck on the walls.
  • 🪑 Furniture for the equipment lined up and will be fitted soon.
  • 💻 Once the furniture is in, all the equipment is nearly ready to be set up. 👍

📦 What’s Coming Next

  • 🗄️ A rack for the Green Room (to host the computer, Zara, etc.).
  • 🛋️ We’re actively seeking seating for the Green Room.
  • 🚪 We’re still on the hunt for a back door with no glass.

💖 Donations Still Needed

🙏 DONATIONS FOR THE BUILD ARE STILL BEING REQUESTED — but a massive THANK YOU to everyone who has already donated. Every contribution is helping us bring this vision to life, bank transfer details below:

Company: KaneFM Ltd

Bank: Lloyds Bank

Sort code: 30-91-53

Account Number: 03662730

Reference: Donation